Learn more about matchdays at Snapdragon Stadium. San Diego FC kicks off in MLS in February 2025.

San Diego FC will be playing 90% of its matches in the evening.

The east side of Snapdragon Stadium will not be impacted during the vast majority of matches.

In 2025, Snapdragon Stadium will have:
- Improved traffic flow
- Added ingress / egress points
- More directional signage
- New ride share locations

90 / 90 / 90
- Fan fest will take place 90 minutes before the match.
- There will be 90 minutes of MLS action.
- Post-match parties will take place 90 minutes after the match.

San Diego FC's Supporters Section features 3,000 safe standing seats.
